| Most viewed |

Nearly, but not quite10 viewsDue to the kink at this point the final block here will need shortening.
|
|

Proof the wall works10 viewsShowing how the wall is retaining water. Shame it's on the wrong side.
|
|

Vulcan 89 views
|
|

Third Section9 viewsThis is the third section and the last with more than one course.
|
|

First Wall Section8 viewsThe section nearest the bridge.
|
|

Vulcan 28 views
|
|

Vulcan 48 views
|
|

Marina Site8 viewsSite of Staveley Town Marina. Work starts September 2010 and it's due to open by 2012. A new lock will be built just before the far bridge.
|
|

Site Access8 viewsThis is the end of the main access track. The slope down to the wall area is about 45 degrees.
|
|

Site from bridge8 viewsThis shows the site layout and the length of wall built.
|
|

Accomodation7 viewsView of the kitchen and dining side of the accommodation from on site.
|
|

Long shot7 viewsWhat happens when a Vulcan doesn't quite go the way you expect. Taken with a D-SLR and 200mm lens on full zoom.
|
|

Vulcan 37 views
|
|

New Bridges7 viewsThis shows the new bridges built as part of the link road project. The canal will pass under the bridge in the middle distance and then use the right-hand span of the bridge in the far distance.
|
|

Staveley Tea Hut7 viewsThis is the new bridge on Hall Lane which was used as shelter during breaks as the gazebo was not usable due to the strong winds.
|
|

Vulcan 56 views
|
|

Overview6 viewsTaken from the new roundabout this shows the relative locations of the site and the accommodation.
|
|

Who Cracked This6 viewsThis is on the roundabout where a group member parked. What was in his car?
|
|

Final Sections5 viewsThe final Sections of the wall, furthest from the bridge.
|
|

Red Arrows 15 views
|
|
|
|